电化学修复对钢筋混凝土单轴拉拔黏结-滑移性能的影响
Effect of electrochemical repair on bond-slip performance of uniaxial pull-out of reinforced concrete
关键词:
电化学修复;钢筋混凝土;中心拉拔;黏结-滑移;静置时间
Key words:
Electrochemical repair; Reinforced concrete; Central pull-out; Bond slip; Standing time
刊期:
2025年第9期
DOI:
10.19761/j.1000-4637.2025.09.015.05
文章编号:
基金项目:
国家自然科学基金项目(51878610、52108177)。
作者:
王向林,陈先明,郑大明,彭 涛,周义强
单位:
中建三局集团(浙江)有限公司,浙江 杭州 310000
摘要
摘 要:研究了电化学修复后钢筋混凝土的黏结性能,分析了电流密度、静置时间对黏结-滑移性能的影响。结果表明:电化学修复会致使钢筋混凝土的黏结性能退化,且黏结性能随电流密度的增加而降低;电化学修复后静置一段时间,由其引起的黏结性能下降情况得到恢复,且恢复程度基本随静置时间的增加而增加。
Abstract: The bond performance of reinforced concrete after electrochemical repair was studied, and the effects of current density and standing time on bond-slip performance were analyzed. The results indicate that electrochemical repair can degrade the bond performance of reinforced concrete, and the bond performance decreases with the increase of current density. After a period of standing time following the repair process, the decrease in bond performance caused by electrochemical repair is restored, and the degree of recovery basically increases with the increase of standing time.
结论
(1)单轴中心拉拔作用下,试件发生黏结滑移破坏和劈裂破坏。电化学修复会降低钢筋与混凝土的黏结性能,且黏结性能基本随电流密度的增加而降低。
(2)电化学修复后静置10、20、30 d,试件的峰值黏结强度、峰值滑移量和残余黏结强度均有一定程度的恢复,且恢复程度基本随静置时间的增加而增加。
参考文献
[1] RODRIGUEZ J.Corrosion of reinforcement and service life of concrete structure[J].Durability Building Materials,1996,7(1):117-126.
[2] FANG C,LUNGDGREN K,CHEN L,et al.Effect of corrosion on bond in reinforced concrete[J].Cement and Concrete Research,2004,34(11):2159-2167.
[3] MAO J H,JIN W L,ZHANG J,et al.Hydrogen embrittlement risk control of prestressed tendons during electrochemical rehabilitation based on bidirectional electro-migration[J].Construction and Building Materials,2019,147:582-591.
[4] ELSENER B,ANGST U.Mechanism of electrochemical chloride removal[J].Corrosion Science,2007,49(12):4504-4522.
[5] CASTELLOT E,LYNESSJ F,MCFARLAND B J,et al.The effect of electrochemical chloride extraction on prestressed concrete[J].Construction and Building Materials,2005,19(8):585-594.
[6] 谢振康,金伟良,毛江鸿,等.双向电迁移后混凝土内钢筋氢含量变化及影响[J].材料导报,2020,34(2):2039-2045.
[7] 孙文博,高小建,杨英姿,等.电化学除氯处理后的混凝土微观结构研究[J].哈尔滨工程大学学报,2009,30(10):1108-1112.
[8] 朱雅仙,洪定海.盐污染混凝土的脱盐防腐[J].水运工程,1996(9):1-5.
[9] LAIMANI G J.Degradation of bondbetween reinforcing steel and concrete due to cathodic protection current[J].ACI Materials Journal,1993,90(1):8-15.
[10] 龚园军.电化学修复后含氢钢筋的低周疲劳性能研究[D].重庆:重庆交通大学,2020.
[11] 李全尧,刘斌,张金峰.电化学除氯对钢筋-混凝土界面黏结力的影响[J].山西建筑,2003,34(12):178-179.
[12] RASHEEDUZZAFAR Z,MOHAMM G A.Degradation of bond between reinforcing steel and concrete due to cathodic protection current[J].ACI Materials Journal,1993,90(1):8-15.
[13] GUO Y X,GONG J X.Degradation of bond between steel bar and freeze-thaw concrete after electrochemical chloride extraction[J].Journal of Central South University of Technology,2010,17(2):388-393.
[14] CHANG J J.Bond degradation due to the desalination process[J].Construction and Building Materials,2003,17(4):281-287.
[15] IHEKWABA N M,HOPE B B.Mechanical properties of anodic and cathodic regions of ECE treated concrete[J].Cement and Concrete Research,1996,26(5):771-780.
[16] EWING S P.Effects of cathodic current on bond strength between concrete and reinforcing steel[R].America:Jersey Research Company,1960.
[17] 韦江雄,王新祥,郑靓,等.电除盐中析氢反应对钢筋-混凝土黏结力的影响[J].武汉理工大学学报,2009,31(12):30-34.
[18] 牛荻涛.混凝土结构耐久性与寿命预测[M].北京:科学出版社,2003.
[19] 郑秀梅,李广军,支秀兰.电化学除盐对钢筋与混凝土间黏结力的影响[J].混凝土,2011(6):46-48,51.
[20] BUENFELD N R,BROOMFIELD J P.Influence of electrochemical chloride extraction on the bond between steel and concrete[J].Magazine of Concrete Research,2000,52(2):79-91.
[21] 徐颖哲.反复荷载作用下钢筋与冻融损伤混凝土黏结性能试验研究[D].西安:西安建筑科技大学,2013.
引用本文
王向林,陈先明,郑大明,等.电化学修复对钢筋混凝土单轴拉拔黏结-滑移性能的影响[J].混凝土与水泥制品,2025(9):15-19.
WANG X L,CHEN X M,ZHENG D M,et al.Effect of electrochemical repair on bond-slip performance of uniaxial pull-out of reinforced concrete[J].China Concrete and Cement Products,2025(9):15-19.