- 王 益1,李 佩1,彭 鑫2,陈康军2
2015年第7期
摘要
引用本文
摘 要:冬季低温环境的混凝土养护措施是否得当对早期非受力裂缝控制起到决定因素,现有的冬季混凝土养护方式存在不规范、混凝土温湿度掌握不准确、养护效率低以及污染严重等问题。通过现场混凝土施工养护试验,证实了混凝土智能蒸汽养护系统的可靠性。
Abstract: The curing measures of concrete is the key factor for controlling the early non-bearing cracks under winter low temperature environment. There are many problems such as non-standard curing method for concrete in winter, inaccuracy for temperature and humidity of concrete, low curing efficiency and serious pollution. Through the curing experiment of concrete construction on site, the reliabilty of concrete intelligent steam is proved.