苏州混凝土水泥制品研究院有限公司

头部文案

发布时间:2020-01-06 00:00:00
全国建材科技期刊
全国中文核心期刊
中国科技论文统计源期刊
万方数据-数字化期刊群入网期刊
中国学术期刊(光盘版)全文收录期刊
华东地区优秀科技期刊
江苏省期刊方阵“双效期刊”
中国期刊网全文收录期刊
中国科技期刊数据库全文收录期刊
空腹复合现浇楼板理论及施工工艺应用研究
Theory of Limosis Composite Cast-in-place Floor and Application Research on Construction Technology
2013年第7期
模盒;定位;空腹复合楼板;密肋梁;混凝土浇筑
Die boxes; Location; Limosis composite floor; Ribbed beams; Concrete pouring
2013年第7期
1000-4637(2013)07-74-03
邓燕华
1. 湖南大学土木工程学院,长沙 4100822.江西中恒建设集团有限公司,南昌 330038; 2.江西建设职业技术学院土木工程系,南昌 330200

邓燕华

浏览量:
1000
摘 要:为了解决大跨度、大空间现浇厚楼板的缺点,在楼板内永久放置BZS模盒,形成空腔。该工艺不但能提高楼板保温和隔音效果,而且可减轻结构自重,节省材料,提高抗震性能。本文介绍了内置BZS模盒现浇楼板的施工工艺、设计特点和施工操作关键技术及质量控制点。 Abstract: In order to solve the defects of large span or large space cast-in-place thick floor, the BZS module box can be installed in the floor permanently to form a cavity. The technology can improve insulation and sound-proofing effects of the cast-in-place floor with the structural weight reducing, material saving and seismic performance improving. In addition, the construction technology, design features, key technologies of construction operation and quality controlling points of the cast-in-place floor with built-in BSZ die boxes built in are introduced.
英文名 : Theory of Limosis Composite Cast-in-place Floor and Application Research on Construction Technology
刊期 : 2013年第7期
关键词 : 模盒;定位;空腹复合楼板;密肋梁;混凝土浇筑
Key words : Die boxes; Location; Limosis composite floor; Ribbed beams; Concrete pouring
刊期 : 2013年第7期
DOI :
文章编号 : 1000-4637(2013)07-74-03
基金项目 :
作者 : 邓燕华
单位 : 1. 湖南大学土木工程学院,长沙 4100822.江西中恒建设集团有限公司,南昌 330038; 2.江西建设职业技术学院土木工程系,南昌 330200

邓燕华

摘要
参数
结论
参考文献
引用本文

摘   要:为了解决大跨度、大空间现浇厚楼板的缺点,在楼板内永久放置BZS模盒,形成空腔。该工艺不但能提高楼板保温和隔音效果,而且可减轻结构自重,节省材料,提高抗震性能。本文介绍了内置BZS模盒现浇楼板的施工工艺、设计特点和施工操作关键技术及质量控制点。

Abstract: In order to solve the defects of large span or large space cast-in-place thick floor, the BZS module box can be installed in the floor permanently to form a cavity. The technology can improve insulation and sound-proofing effects of the cast-in-place floor with the structural weight reducing, material saving and seismic performance improving. In addition, the construction technology, design features, key technologies of construction operation and quality controlling points of the cast-in-place floor with built-in BSZ die boxes built in are introduced.

关键词:
模盒;定位;空腹复合楼板;密肋梁;混凝土浇筑
扫二维码用手机看
未找到相应参数组,请于后台属性模板中添加

内置模盒现浇楼板虽然能够节约材料,减轻自重,降低造价,提高抗震,增大建筑净高,改善楼板的隔音、隔热性能,但仅限于大跨度和大空间现浇楼板结构使用,其传力途径与普通楼板相同[10],不同是的在构造上两者差异较大,前者更复杂、要求更严格,影响质量的因素更多。施工过程中,模盒的选择与定位,密肋梁板钢筋的绑扎及混凝土浇捣是影响质量的关键环节。

[1] GSA.Progressive collapse analysis and design guidelines for new federal office buildings and major modernization projects [s].USA;General Services Administration,2003:10-42.
[2] UFC 4-010-01 DoD minimum antiterrorism standards for building Es.USA l DoD,2003.
[3] AscE 7-05 Minimum design loads for buildings and other structures.USA:American Society of Civil Engineers,2005.
[4] 中华人民共和国建设部,中华人民共和国国家质量监督检验检疫总局.GB 50009—2012建筑结构荷载规范 [S].北京:中国建筑工业出版社,2012.
[5] 中华人民共和国住房和城乡建设部,中华人民共和国国家质量监督检验检疫总局.GB 50010—2010 钢筋混凝土结构设计规范[S].北京:中国建筑工业出版社,2010.
[6] 中华人民共和国住房和城乡建设部,中华人民共和国国家质量监督检验检疫总局.GB 50011—2010建筑抗震设计规范 [S].北京:中国建筑工业出版社,2010.
[7] 杨静,王肖伍.无梁现浇混凝土空心楼板应用技术[C].全国高校建筑施工学科研究会,2008:12-16.
[8] 虞立新,薛世旁.现浇空心无梁楼盖(GBF管)施工技术[J].西部探矿工程,2005(7):63.
[9] 中华人民共和国建设部,中华人民共和国国家质量监督检验检疫总局.GB 50204—2002混凝土结构工程施工质量验收规范[S].北京:中国建筑工业出版社,2002.
[10] 金建.现浇钢筋混凝土无梁空心板工作性能的实验研究[D].南京:东南大学硕士学位论文,2004.

相关文件

暂时没有内容信息显示
请先在网站后台添加数据记录。

关注《混凝土与水泥制品》

总访问量 468,401   网站统计

官方微信公众号关闭
苏州混凝土水泥制品研究院有限公司

关于我们    |    联系我们    |    订购杂志    |    回到顶部

版权所有:中国混凝土与水泥制品网  苏ICP备10086386号   网站建设:中企动力 苏州

版权所有:中国混凝土与水泥制品网

苏ICP备10086386号

网站建设:中企动力 苏州