张 宇,郝以党,柯国炬,刘银梅,赵 蕊
摘 要:概述了钢渣的处理技术,分析了钢渣的基本特性,提出了钢渣在建材行业实现高附加值利用的方法。
Abstract: The treatment technology of steel slag is introduced, the basic characteristics of steel slag are analyzed, and the using method of high additional value for steel slag in building industry is proposed.
于 淼,倪 文,刘 佳,刘立国
摘 要:利用以高炉水淬矿渣为主要原料的胶凝材料试验制作了人工鱼礁,并初步评价了人工鱼礁的实际应用效果。通过配比优化实验,最终选定材料配比为矿渣(80%):石膏(10%):水泥熟料(10%):减水剂(1%),胶砂试块3d抗压强度40MPa,28d抗压强度60MPa以上,满足人工鱼礁强度要求,同时,制作出的鱼礁海洋相容性良好,有大量水生生物附着。
Abstract:Experiment research on cementitious material made of blast furnace slag(BSF) as the major raw material to make artificial reefs is carried out, and the effect of practical application on artificial reefs is assessed. Through the optimized experiments, the finial material ratio as BFS(80%), gypsum(10%), cement (10%), water reducer(1%) is determined. The 3 days compressive strength of the specimen is 40MPa and the 28 days compressive strength up to 60MPa, which can satisfy the strength requirements of artificial reefs. Meanwhile, the reefs have well marine compatibilities and are adhered by lots of aquatic lives.
岳鹏威1,刘少兵2,黄瑞华2
摘 要:以重庆大剧院工程的SRC施工实践为依托,介绍了SRC大悬挑大悬挂结构的施工工艺,包括SRC钢结构的深化设计制作、大悬挑钢骨地脚螺栓预埋方法、刚性支撑设计、安装、预拱度设置、悬挂钢结构施工、型钢骨定位安装、悬挑钢桁架吊拼安装、高强螺栓连接工艺、钢结构厚板焊接、悬挑型钢砼组合结构支架搭设等重点与难点施工工艺。
Abstract: Based on the construction practice of SRC for Chongqing Grand Theater Project, the construction technology of large overhanging and suspension structure of SRC is introduced, including the detailing design of steel structure of SRC, construction method of pre-embedded anchoring bolts for steel structure, rigid support design and installation, camber setting, construction of suspension steel structure, location and construction of steel, lifting and installation of suspension steel truss, connection craft of high-strength bolts, steel plate welding, the support of overhanging steel concrete composite structures and so on
曹明莉,张 聪
摘 要:以某筏板基础大体积混凝土实际工程为研究对象,采用理论计算与工程现场试验相结合的方法,分析了该筏基工程混凝土出现裂缝的原因,并结合工程实际给出了温度裂缝控制的技术措施。
Abstract: Taking one mass concrete raft foundation project as research object, using the method of theoretic calculation combining with project site tests, the reasons for the cracks of the raft foundation project are analyzed, and the technical measures on controlling thermal cracks are given combined with this project.
周紫晨,曾 明,冯 群,张 冰
摘 要:对配制预应力梁管道压浆料常用的各种材料进行了对比试验,研究了各组分对压浆料工作性和膨胀性能的影响。
Abstract:The compared tests of several normal materials of pipeline grouting for prestressed concrete beam are carried out, and the influences of compositions on the workability and expansive ability of grouting are researched.
王甲春1,2,钱 澄1,郑永尊1
摘 要:通过碳化实验,测定了加气混凝土砌块在碳化条件下的收缩变形、碳化深度,碳化后加气混凝土砌块的抗压强度和抗折强度。研究结果表明:实验室碳化条件下加气混凝土砌块的收缩发展呈现三个阶段:(I)早期快速发展阶段,(II)稳定阶段,(III)加速发展阶段;表面砂浆层能够明显降低碳化收缩的发展,加气混凝土砌块碳化深度与碳化时间成正比,抗压强度和抗折强度都随着碳化的发展而下降。
Abstract: Through the carbonation experiment, the shrinkage deformation, carbonation deep, compressive strength and flexural strength of autoclaved aerated concrete blocks are measured. The results indicate that the shrinkage development of aerated concrete blocks under lab carbonation condition is divided three stages: (I) early age rapid developing stage,(II) steady stage and (III) accelerating developing stage. The surface mortar of autoclaved aerated concrete blocks can obviously decrease the carbonation shrinkage value. The carbonation deep of autoclaved aerated concrete blocks is proportional to the carbonation time, and the compressive strength and flexural strength decrease with the carbonation development.