[1] 窦铁生,燕家琪.预应力钢筒混凝土管(PCCP)的破坏模式及原因分析[J]. 混凝土与水泥制品,2014(1):29-34.
[2] Ball R T,Moore W G,Smith D L, et al.Prestressed Concrete Cylinder Pipe Rehabilitation Repair and Replacement:Large Diameter Success Stories[J]. Florida Water Resources Journal. 2012(8):4-10.
[3] 窦铁生,程冰清,胡赫,等.预应力钢筒混凝土管结构变形规律的原型试验研究Ⅱ:外压[J].水利学报,2018,49(2):207-215.
[4] 窦铁生,程冰清,胡赫,等.预应力钢筒混凝土管结构变形规律的原型试验研究Ⅰ:内压[J].水利学报,2017(12):1438-1446.
[5] Price R E,Lewis R A,Erlin. Effects of environment on the durability of prestressed concrete cylinder pipe[C].Pipelines in the Constructed Environment,1998:584-593.
[6] Ge S,Sinha S.Deterioration modeling of PCCP water pipes[C]. North American Society for Trenchless Technology,2011:1-11.
[7] 张海丰,董顺,周维,等.预应力钢筒混凝土管(PCCP)结构修复更新技术介绍[J].给水排水,2017(8):104-108.
[8] Kenny M K, Rahman S.San Diego County Water Authority Aqueduct Protection Program since 1992:Evolution in Design and Construction of Steel Cylinder Relining of PCCP[J]. Pipelines 2014: From Underground to the Forefront of Innovation and Sustainability,2014:872.
[9] Rahman S, Smith G,Mielke R.Rehabilitation of Large Diameter PCCP: Relining and Sliplining with Steel Pipe[J].Pipelines 2012:Innovations in Design, Construction, Operations, and Maintenance-Doing More with Less,2012:494-504.
[10] Smith G,Bruny J.Relining Prestressed Concrete Cylinder Pipe, A Manufacturers Perspective[C].Pipelines 2004: Pipeline Engineering and Construction - What's on the Horizon, 2004.
[11] Michael Ambroziak P E,Brandy Kelso P E,Sinclair J.Development and Construction of the Nations Largest Water Main Rehab Project[C]. Pipelines 2010:Climbing New Peaks to Infrastructure Reliability—Renew,Rehab, and Reinvest,2010.
[12] Ambroziak M, Kelso B, Sinclair J.Development and Construction of the Nation’s Largest Water Main Rehab Project[C]. Pipelines 2010:Climbing New Peaks to Infrastructure Reliability, 2010.
[13] 窦铁生,程冰清,胡赫,等.CFRP修复PCCP的内水压试验[J].混凝土与水泥制品,2017(12):35-40.
[14] Elnakhat H,Raymond R.Repair of PCCP by Post Tensioning[C].Pipelines,2006:1-5.