PHC管桩预应力传递性能试验研究
Experimental Research on Prestressed Transfer Performances of PHC Piles
2010年第3期
预应力传递长度;PHC管桩;试验研究
Prestressed transfer length; PHC piles; Experimental research
2010年第3期
1000-4637(2010)03-35-03
吴 锋1,2,邱 松1,卓 杨1,丁捍东1
1.中交上海三航科学研究院有限公司,200032;2.上海交通大学,200030

吴 锋1,2,邱 松1,卓 杨1,丁捍东1

浏览量:
1000
摘 要:根据先张法预应力混凝土管桩(PHC)镦头释放、切割、大锤凿桩和风镐凿桩等不同截桩方式试验研究,分析了截桩方式对PHC管桩预应力传递长度的影响,并通过现场试验和理论分析,确定了PHC管桩截桩后的预应力传递长度,为设计提供了可靠的试验依据。 Abstract: To carry out a experimental research on pretensioned prestressed concrete pile by different pile cut-off ways such as end release, cutting, sledge hammer chisel and pneumatic pick etc., the influence of different cut-off ways on its prestressed transfer length of PHC piles is studied. Meanwhile, the prestressed transfer length after cut-off has been determined through field tests and theoretical analysis, which provides a reliable basis for design.
英文名 : Experimental Research on Prestressed Transfer Performances of PHC Piles
刊期 : 2010年第3期
关键词 : 预应力传递长度;PHC管桩;试验研究
Key words : Prestressed transfer length; PHC piles; Experimental research
刊期 : 2010年第3期
DOI :
文章编号 : 1000-4637(2010)03-35-03
基金项目 :
作者 : 吴 锋1,2,邱 松1,卓 杨1,丁捍东1
单位 : 1.中交上海三航科学研究院有限公司,200032;2.上海交通大学,200030

吴 锋1,2,邱 松1,卓 杨1,丁捍东1

摘要
参数
结论
参考文献
引用本文

摘   要:根据先张法预应力混凝土管桩(PHC)镦头释放、切割、大锤凿桩和风镐凿桩等不同截桩方式试验研究,分析了截桩方式对PHC管桩预应力传递长度的影响,并通过现场试验和理论分析,确定了PHC管桩截桩后的预应力传递长度,为设计提供了可靠的试验依据。

Abstract: To carry out a experimental research on pretensioned prestressed concrete pile by different pile cut-off ways such as end release, cutting, sledge hammer chisel and pneumatic pick etc., the influence of different cut-off ways on its prestressed transfer length of PHC piles is studied. Meanwhile, the prestressed transfer length after cut-off has been determined through field tests and theoretical analysis, which provides a reliable basis for design.

关键词:
预应力传递长度;PHC管桩;试验研究
扫二维码用手机看
未找到相应参数组,请于后台属性模板中添加
(1)通过对PHC管桩在现场的预应力传递长度的测试,在镦头锚固释放法(气割)截桩的情况下,距截面的预应力传递距离为70~75cm;在端部进行齿轮切割的情况下,距切割截面的预应力传递距离约为35cm。
(2) 对比测试的结果表明,截桩方式对预应力传递性能有很大影响,大锤截桩和风镐截桩预应力传递长度大于规范许可范围,在实际工程中应避免使用。
[1] 吴锋,刘兹胜,方炫强,等. 后张法预应力混凝土管桩预应力传递长度试验研究[J]. 水运工程,2009.2.
[2] Xu Jun-xiang, Liu Xi-la, A two-step approach to progressive collapse analysis of building structures under blast loading [J], Journal of shanghai jiaotong university(science),2009;14(4):393-397
[3] GB13476-1999. 先张法预应力混凝土管桩[S].
[4] JISA5337. 先张法预应力离心高强混凝土管桩[S].
[5] JTG D62-2004. 公路钢筋混凝土及预应力混凝土桥涵设计规范[S].
[6] JTJ267-98. 港口工程混凝土结构设计规范[S].
[7] GB50010-2002. 混凝土结构设计规范[S].
[8] DL/T5057-1996. 水工混凝土结构设计规范[S].

相关文件

暂时没有内容信息显示
请先在网站后台添加数据记录。

关注《混凝土与水泥制品》

总访问量 468,401   网站统计

官方微信公众号关闭
苏州混凝土水泥制品研究院有限公司

关于我们    |    联系我们    |    订购杂志    |    回到顶部

版权所有:中国混凝土与水泥制品网  苏ICP备10086386号   网站建设:中企动力 苏州

版权所有:中国混凝土与水泥制品网

苏ICP备10086386号

网站建设:中企动力 苏州