商文念,刘建秋,魏珍中,赵海涛,李 林
超长大体积混凝土整体基础后浇带临界 浇筑长度研究
Research on Critical Casting Length of Post-casting Belt of Ultra-long Mass Concrete Overall Foundation
2019年第2期
整体基础;大体积混凝土;后浇带;临界浇筑长度
Overall foundation; Mass concrete; Post-casting belt; Critical casting length
2019年第2期
10.19761/j.1000-4637.2019.02.085.05
国家自然科学基金项目(51309090、 51878245)。
商文念,刘建秋,魏珍中,赵海涛,李 林
(1.山东电力工程咨询院有限公司,济南 250199;2.河海大学土木与交通学院,南京210098)
商文念,刘建秋,魏珍中,等.超长大体积混凝土整体基础后浇带临界浇筑长度研究[J].混凝土与水泥制品,2019(2):85-89.
SHANG W N,Liu J Q,Wei Z Z,et al.Research on Critical Casting Length of Post-casting Belt of Ultra-long Mass Concrete Overall Foundation[J].China Concrete and Cement Products,2019(2):85-89.
浏览量:
1000
超长大体积混凝土整体基础后浇带临界 浇筑长度研究
英文名 :
Research on Critical Casting Length of Post-casting Belt of Ultra-long Mass Concrete Overall Foundation
刊期 :
2019年第2期
关键词 :
整体基础;大体积混凝土;后浇带;临界浇筑长度
Key words :
Overall foundation; Mass concrete; Post-casting belt; Critical casting length
刊期 :
2019年第2期
DOI :
10.19761/j.1000-4637.2019.02.085.05
文章编号 :
基金项目 :
国家自然科学基金项目(51309090、 51878245)。
作者 :
商文念,刘建秋,魏珍中,赵海涛,李 林
单位 :
(1.山东电力工程咨询院有限公司,济南 250199;2.河海大学土木与交通学院,南京210098)
商文念,刘建秋,魏珍中,赵海涛,李 林
商文念,刘建秋,魏珍中,等.超长大体积混凝土整体基础后浇带临界浇筑长度研究[J].混凝土与水泥制品,2019(2):85-89.
SHANG W N,Liu J Q,Wei Z Z,et al.Research on Critical Casting Length of Post-casting Belt of Ultra-long Mass Concrete Overall Foundation[J].China Concrete and Cement Products,2019(2):85-89.
摘要
参数
结论
参考文献
引用本文
摘 要:采用后浇带法实现超长大体积混凝土整体基础,可兼顾土建结构和上部电器设备设置要求,而混凝土后浇带临界浇筑长度取值是该方法的关键技术问题之一。本文采用ANSYS有限元软件建立超长大体积混凝土基础模型,分析了不同季节、入仓温度和地基约束工况下的后浇带合理浇筑长度。计算结果表明,浇筑长度对混凝土温度应力影响明显,而合理的浇筑长度选取应综合考虑入仓温度、季节和基础约束程度等因素。
Abstract: The post-casting method is used to pour the overall foundation of ultra-long mass concrete, which can take into account the requirements of civil engineering structure and upper electrical equipment. The value of critical pouring length of concrete post-casting belt is one of the key technical problems of this method. The ANSYS finite element software is used to establish the ultra-long mass concrete foundation model. The reasonable pouring length of the post-casting belt under different seasons, storage temperature and foundation is systematically analyzed. The results show that the casting length has obvious influence on the concrete temperature stress, and the reasonable pouring length selection should consider the factors such as the temperature, season and foundation constraint.