钢筋混凝土顶管施工端面裂缝模拟分析
Simulation Analysis on Section Cracks of Reinforced Concrete Pipe used for Jacking Construction
2022年第11期
钢筋混凝土顶管;端面裂缝;顶环;有限元分析
Reinforced concrete pipe used for jacking construction(DRCP); Section crack; Top ring; Finite element (FE) method analysis
2022年第11期
10.19761/j.1000-4637.2022.11.035.04
袁焕鑫1,蒋强忠2,杜新喜2,张 帆2,李昌正2
1.武汉大学,湖北 武汉 430072;2.湖北中南管道有限公司,湖北 武汉 430200

袁焕鑫1,蒋强忠2,杜新喜2,张 帆2,李昌正2

袁焕鑫,蒋强忠,杜新喜,等.钢筋混凝土顶管施工端面裂缝模拟分析[J].混凝土与水泥制品,2022(11):35-38.

YUAN H X,JIANG Q Z,DU X X,et al.Simulation Analysis on Section Cracks of Reinforced Concrete Pipe used for Jacking Construction[J].China Concrete and Cement Products,2022(11):35-38.

浏览量:
1000
摘   要:为分析钢筋混凝土顶管施工过程中端面开裂情况,考虑材料的几何非线性和混凝土的损伤退化,建立了ABAQUS有限元数值模型。并基于施工现场数据,验证了模型的可靠性,模拟了顶环截面形式、千斤顶布置方式、顶环高度3个参数对顶管断面裂缝的影响。结果表明:在顶进施工条件允许情况下,建议采用均布、对称的千斤顶布置方式;顶环采用闭口截面和适当的高度可减少管体顶进过程中裂缝的产生。 Abstract: In order to analyze the section cracks development of reinforced concrete pipe used for jacking construction, taking the geometric nonlinearity of materials and the damage and degradation of concrete into account, the ABAQUS finite element model was established, and the reliability of the model was verified based on the construction site data. The three influence parameters of jack layout, top ring height and top ring section form on the section cracks were studied. The results show that it is recommended to use symmetric jacks under the premise of permitting construction conditions. The arrangement is more conducive to the force of the pipe body, and the closed cross-section and appropriate height of the top ring are more conducive to control the development of cracks during the pipe body jacking process.
英文名 : Simulation Analysis on Section Cracks of Reinforced Concrete Pipe used for Jacking Construction
刊期 : 2022年第11期
关键词 : 钢筋混凝土顶管;端面裂缝;顶环;有限元分析
Key words : Reinforced concrete pipe used for jacking construction(DRCP); Section crack; Top ring; Finite element (FE) method analysis
刊期 : 2022年第11期
DOI : 10.19761/j.1000-4637.2022.11.035.04
文章编号 :
基金项目 :
作者 : 袁焕鑫1,蒋强忠2,杜新喜2,张 帆2,李昌正2
单位 : 1.武汉大学,湖北 武汉 430072;2.湖北中南管道有限公司,湖北 武汉 430200

袁焕鑫1,蒋强忠2,杜新喜2,张 帆2,李昌正2

袁焕鑫,蒋强忠,杜新喜,等.钢筋混凝土顶管施工端面裂缝模拟分析[J].混凝土与水泥制品,2022(11):35-38.

YUAN H X,JIANG Q Z,DU X X,et al.Simulation Analysis on Section Cracks of Reinforced Concrete Pipe used for Jacking Construction[J].China Concrete and Cement Products,2022(11):35-38.

摘要
参数
结论
参考文献
引用本文

摘   要:为分析钢筋混凝土顶管施工过程中端面开裂情况,考虑材料的几何非线性和混凝土的损伤退化,建立了ABAQUS有限元数值模型。并基于施工现场数据,验证了模型的可靠性,模拟了顶环截面形式、千斤顶布置方式、顶环高度3个参数对顶管断面裂缝的影响。结果表明:在顶进施工条件允许情况下,建议采用均布、对称的千斤顶布置方式;顶环采用闭口截面和适当的高度可减少管体顶进过程中裂缝的产生。

Abstract: In order to analyze the section cracks development of reinforced concrete pipe used for jacking construction, taking the geometric nonlinearity of materials and the damage and degradation of concrete into account, the ABAQUS finite element model was established, and the reliability of the model was verified based on the construction site data. The three influence parameters of jack layout, top ring height and top ring section form on the section cracks were studied. The results show that it is recommended to use symmetric jacks under the premise of permitting construction conditions. The arrangement is more conducive to the force of the pipe body, and the closed cross-section and appropriate height of the top ring are more conducive to control the development of cracks during the pipe body jacking process.

扫二维码用手机看
未找到相应参数组,请于后台属性模板中添加

(1)通过有限元数值模型可以较精确地模拟钢筋混凝土顶管在施工过程中的裂缝开展情况。同时,顶环高度、顶环截面形式和千斤顶布置形式将显著影响顶进法施工时裂缝的产生和发展。
(2)为减少顶管施工端面裂缝的产生概率,建议顶环截面采用三腹板箱梁结构,并适当增加顶环高度,提高顶环的抗弯强度和刚度,增强顶环抵抗弯曲变形的能力。
(3)千斤顶的布置方式对顶管端面裂缝的影响不可忽略,在满足施工要求情况下,尽可能采用千斤顶对称布置的方式,从而改善钢筋混凝土顶管的受力特性。

[1] 黄以春,蔡海兵,李阳.顶管法施工对土体影响的理论分析与数值计算[J].混凝土与水泥制品,2015(1):73-77.
[2] 王彦明.混凝土顶管施工技术应用[J].四川建材,2016,42(6):151-152,155.
[3] 刘航军,曹振生,刘宗志,等.顶管施工土体扰动的实测分析研究[J].混凝土与水泥制品,2016(6):78-81.
[4] 谈维汉.顶进法施工过程中管材破损的原因分析[J].建筑装饰材料世界,2009(3):46-49.
[5] 岳倩格.千斤顶位置对预应力钢筒混凝土顶管的影响[C]// 中冶建筑研究总院有限公司.2020年工业建筑学术交流会论文集(下册).北京:工业建筑杂志社,2020:4.
[6] YE Y.Pavement Deformation Prediction and Monitoring Case Analysis of Jacking and Underpass Highway in Huairou District,Beijing[J].IOP Conference Series: Materials Science and Engineering,2020,768(3):032050.
[7] LI W J.Research on Influnence Law of Existing Pipe-jacking Tunnel Affected by Adjacent Foundation Pit Excavation in Soft Clay Stratum[J].IOP Conference Series:Materials Science and Engineering,2019,688(2):1772-1775.
[8] 国家市场监督管理总局,国家标准化管理委员会.金属材料 拉伸试验 第1部分:室温试验方法:GB/T 228.1—2010[S].北京:中国标准出版社,2010.
[9] 中华人民共和国住房和城乡建设部,国家市场监督管理总局.混凝土物理力学性能试验方法标准:GB/T 50081—2019[S].北京:中国建筑工业出版社,2019.
[10] 过镇海.混凝土的强度和本构关系:原理与应用[M].北京:中国建筑工业出版社,2004.
[11] 张劲,王庆扬,胡守营,等.ABAQUS混凝土损伤塑性模型参数验证[J].建筑结构,2008(8):127-130.

袁焕鑫,蒋强忠,杜新喜,.钢筋混凝土顶管施工端面裂缝模拟分析[J].混凝土与水泥制品,2022(11):35-38.

YUAN H X,JIANG Q Z,DU X X,et al.Simulation Analysis on Section Cracks of Reinforced Concrete Pipe used for Jacking Construction[J].China Concrete and Cement Products,2022(11):35-38.

相关文件

暂时没有内容信息显示
请先在网站后台添加数据记录。

关注《混凝土与水泥制品》

总访问量 468,401   网站统计

官方微信公众号关闭
苏州混凝土水泥制品研究院有限公司

关于我们    |    联系我们    |    订购杂志    |    回到顶部

版权所有:中国混凝土与水泥制品网  苏ICP备10086386号   网站建设:中企动力 苏州

版权所有:中国混凝土与水泥制品网

苏ICP备10086386号

网站建设:中企动力 苏州