传统管桩生产车间技术改造的探索与实践

Discussion and Practice of Technical Transformation for Traditional Pipe Production Workshop

浏览量:

关键词:

管桩生产线;技术改造;生产效率;产品质量

Key words:

Pipe production line; Technical transformation; Production efficiency; Product quality

刊期:

2017年第2期

DOI:

文章编号:

1000-4637(2017)02-33-04

基金项目:

作者:

陈玉文

单位:

宁波迈克管桩有限公司,315031

摘要

摘   要:针对传统管桩生产线存在的5个主要问题,提出了相应的技改措施。对生产工艺进行了重新布局,将喂料方式改为模具移动式,并结合自动夹具的使用、蒸养池的改造以及上模架的使用,提高了生产效率、生产安全性及产品质量,减少了工作人员,有效改善了生产环境。

Abstract: In view of the five major problems of the traditional pile production line, the corresponding technical transformation measures are put forward, such as the arrangement of production process layout is relocated, the way of feeding is changed to mould moving, the automatic fixture is used, the steam chamber is reconstructed and up-mould stand is used. Based on these measures, production efficiency, production safety, product quality and the production environment are improved and the production costs is reduced. 

结论

(1)传统的管桩生产线通过适当的工艺技术改造,生产效率、安全、环境及产品质量都可以得到提升,生产成本有所下降,投入一定的资金进行改造是值得的。
(2)混凝土搅拌站、喂料系统是改造的重点,要突破传统工艺的束缚,寻找到符合自身实际的方法,力求做到投入少、效益高。
(3)改造时一定要对安全生产和生产环境问题进行仔细研究,从源头上避免不安全生产操作。
(4)通过技改可以达到减少浪费降低生产成本的目的,按年度计算,经济效益可观。

参考文献

[1] 苏州混凝土水泥制品研究院、苏州中材建筑建材设计研究院.GB 13476—2009 《先张法预应力混凝土管桩》[S].北京:中国标准出版社,2009.
[2] 浙江大学建筑设计研究院有限公司.2013 浙G35 《预应力离心混凝土空心方桩》[S].浙江:浙江工商大学出版社,2013.

引用本文

陈玉文.传统管桩生产车间技术改造的探索与实践[J].混凝土与水泥制品,2017(2):33-36.

CHEN Y W.Discussion and Practice of Technical Transformation for Traditional Pipe Producton Workshop[J].China Concrete and Cement Products,2017(2):33-36.