传统管桩生产车间技术改造的探索与实践
Discussion and Practice of Technical Transformation for Traditional Pipe Production Workshop
关键词:
管桩生产线;技术改造;生产效率;产品质量
Key words:
Pipe production line; Technical transformation; Production efficiency; Product quality
刊期:
2017年第2期
DOI:
文章编号:
1000-4637(2017)02-33-04
基金项目:
作者:
陈玉文
单位:
宁波迈克管桩有限公司,315031
摘要
摘 要:针对传统管桩生产线存在的5个主要问题,提出了相应的技改措施。对生产工艺进行了重新布局,将喂料方式改为模具移动式,并结合自动夹具的使用、蒸养池的改造以及上模架的使用,提高了生产效率、生产安全性及产品质量,减少了工作人员,有效改善了生产环境。
Abstract: In view of the five major problems of the traditional pile production line, the corresponding technical transformation measures are put forward, such as the arrangement of production process layout is relocated, the way of feeding is changed to mould moving, the automatic fixture is used, the steam chamber is reconstructed and up-mould stand is used. Based on these measures, production efficiency, production safety, product quality and the production environment are improved and the production costs is reduced.
结论
参考文献
引用本文
陈玉文.传统管桩生产车间技术改造的探索与实践[J].混凝土与水泥制品,2017(2):33-36.
CHEN Y W.Discussion and Practice of Technical Transformation for Traditional Pipe Producton Workshop[J].China Concrete and Cement Products,2017(2):33-36.