全部文章
新能源水泥基制品
宋秋磊1,2,骆静静1,2,李梦媛3,田 寅1,2,曹鑫铖1,2
摘 要:为拓展超高性能混凝土(UHPC)在风电塔筒管片上的应用,开展了机制砂UHPC在风电塔筒管片中的应用研究。结果表明:在颗粒级配近似替代的原则下,采用连续级配的机制砂可制备出性能优异的UHPC,蒸汽养护48 h后,机制砂UHPC的抗压强度约172.6 MPa,抗拉强度约9.99 MPa;采用机制砂UHPC制备风电塔筒管片,虽然其早期水化放热量较大(内部温度最高可达约80 ℃),但严格控制生产工艺,可使机制砂UHPC塔筒管片表面无裂缝及其他缺陷。
Abstract: To expand the application of ultra-high performance concrete(UHPC) on wind turbine tower tube segments, the application of manufactured sand in UHPC wind turbine tower segments was studied. The results show that under the principle of approximate substitution of particle size distribution, using continuously graded manufactured sand can prepare high performance UHPC. After steam curing for 48 h, the compressive strength of UHPC is about 172.6 MPa, and the tensile strength is about 9.99 MPa. Using UHPC with manufactured sand to prepare wind turbine tower tube segments, although its early hydration heat release is relatively large(the internal temperature can reach up to about 80 ℃). However, strict control of production processes can ensure that the surface of UHPC tower tube segments with manufactured sand is free of cracks and other defects.
宋秋磊,骆静静,李梦媛,等.机制砂UHPC的性能及其在风电塔筒管片中的应用研究[J].混凝土与水泥制品,2024(10):58-63.
SONG Q L,LUO J J,LI M Y,et al.Study on the performance of UHPC with manufactured sand and its application in wind turbine tower segments[J].China Concrete and Cement Products,2024(10):58-63.
张后禅,张 祥
摘 要:在设计使用年限内,风力发电机组装配式预应力混凝土塔筒的疲劳问题非常突出,尤其在塔筒1/2高度以上区域。国内标准的疲劳验算公式是基于等幅疲劳2×106次的试验研究结果,而风力发电机组混凝土塔筒的疲劳次数在3×108以上,故国内标准不适用风电机组混凝土塔筒的疲劳验算。而欧标Fib Model Code for Concrete Structures 2010(FIB规范)采用基于S-N曲线的Palmgren-Miner累积损伤方法进行混凝土疲劳验算,可以解决高次数的疲劳问题。介绍了FIB规范中混凝土塔筒常用的Ⅲ级和Ⅳ级设计方法,通过具体案例分析了混凝土塔筒疲劳承载力的影响因素。结果表明:提高混凝土强度等级和加大塔筒壁厚,可以有效提高塔筒的疲劳承载力。可为风力发电机组装配式预应力混凝土塔筒实际设计提供参考。
Abstract: During the design life, the fatigue of assembled prestressed concrete tower of wind turbine is very prominent, especially in the above 1/2 height of the tower. The fatigue checking formulas of domestic standards are based on the experimental results of 2×106 times of constant amplitude fatigue, and the fatigue times of the concrete tower of wind turbine are more than 3×108 , therefore the domestic standards are not applicable to the fatigue checking of the concrete tower of wind turbine. The fatigue checking method of Fib Model Code for Concrete Structures 2010(FIB specification) is based on Palmgren-Miner cumulative damage method and S-N curve, which can solve the high frequency fatigue problem. The commonly used Ⅲ level and Ⅳ level design method of concrete tower were introduced, and the influencing factors of fatigue capacity of concrete tower through examples were analyzed. The results show that increasing the concrete strength and increasing the thickness of tower wall can effectively improve the fatigue capacity. It can provide reference for the actual design of assembled prestressed concrete tower of wind turbine.
张后禅,张祥.风力发电机组装配式预应力混凝土塔筒疲劳承载力分析[J].混凝土与水泥制品,2024(10):64-67.
ZHANG H C,ZHANG X.Fatigue capacity analysis of assembled prestressed concrete tower of wind turbine[J].China Concrete and Cement Products,2024(10):64-67.
张宇豪1,2,吴香国1,3a,3b,*,陈发桥2,雍 飞2,高朝利2,李博洋3a,3b,*
摘 要:混凝土塔架采用预制管片通过水平和竖向节点组合而成,其组装需要现场进行吊装,吊装质量直接影响整塔的服役性能。在吊装方案中,吊钩吊点布置会导致管片受力存在差异。当环氧树脂结构胶尚未达到设计强度时,环段的整体性也未达到预期设计性态,管片起吊时由于重力影响而产生较大变形,严重时可能会导致管片的错台、崩边等工程质量问题。为了探究典型吊装工况对混塔吊装环段性态的影响,基于非线性有限元软件,以实际工程为背景,设计了3种不同的吊装工况(理想、工程、设计),研究了不同工况下混塔环段变形随吊装方式的影响。结果表明:通过调节各个吊带长度,将吊点处吊带沿多个方向布置,可使吊带内力均匀分布,从而减小管片的变形。
Abstract: The concrete tower is composed of prefabricated segments combined through horizontal and vertical joints, and its assembly requires on-site lifting. The lifting quality directly affects the service performance of the entire tower. In the lifting plan, the arrangement of hook lifting points may result in differences in the stress on the segments. When the epoxy resin structural adhesive has not yet reached the design strength, the overall integrity of the ring segment has not reached the expected design state. During the lifting of the segment, significant deformation may occur due to the influence of gravity, which may lead to engineering quality problems such as misalignment and edge collapse of the segment in severe conditions. In order to explore the influence of typical lifting conditions on the behavior of the hybrid tower lifting ring section, three different lifting cases(ideal, engineering, design) based on nonlinear finite element software and practical engineering background were designed, and the influence of the deformation of the hybrid tower ring section with the lifting solution under different working conditions were studied. The results show that by adjusting the length of each sling and arranging the sling along multiple directions at the lifting point, the internal force of the sling can be evenly distributed, thereby reducing the deformation of the pipe pieces.
张宇豪,吴香国,陈发桥,等.环段吊装方案对风电混塔管片变形的影响分析[J].混凝土与水泥制品,2024(10):68-72.
WU X G,CHEN F Q,YONG F,et al.Analysis of the influence of ring lifting solution on the deformation of wind power hybrid tower segment[J].China Concrete and Cement Products,2024(10):[J].China Concrete and Cement Products,2024(10):68-72.
韩 斐1,2,马建春1,2,李占岭1,2,袁 奔1,2,梁大鹏3
摘要:基于已发布实施的能源行业标准NB/T 11311—2023《环形截面混凝土电杆结构设计规程》有关高强混凝土电杆正截面受弯承载力、开裂弯矩、裂缝宽度、挠度的计算公式,对比研究了掺钢纤维、未掺钢纤维混凝土电杆的力学性能。基于结果,建议在工程计算时考虑钢纤维对混凝土电杆性能的影响,并通过试验来确定钢纤维对电杆性能的影响系数;另外,高强混凝土电杆具有占地少、施工方便、施工效率高等特点,在输配电线路中应用具有显著的技术、经济和社会效益。
Abstract: Based on the calculation formulas of bending bearing capacity of positive cross section, cracking moment, crack width, and deflection of high strength concrete poles contained in the published and implemented energy industry standard NB/T 11311—2023 Code for design of conerete pole structure with circular cross section, the mechanical properties of concrete poles with and without steel fibers are comparatively investigated. Based on the results, the effect of steel fiber on the performance of concrete poles is recommended to be considered in engineering calculations, and the influence coefficient of steel fiber on the performance of poles is determined through tests. In addition, the high strength concrete poles have the characteristics of occupying less land, convenient construction and high construction efficiency, and its application in transmission and distribution lines can generate significant technical, economic and social benefits.
韩斐,马建春,李占岭,等.环形高强混凝土电杆设计方法及力学性能试验研究[J].混凝土与水泥制品,2024(10):73-78.
HAN F,MA J C,LI Z L,et al.Design method and experimental study on mechanical properties of high strength circular concrete poles[J].China Concrete and Cement Products,2024(10):73-78.