预制混凝土叠合板钢筋黏结性能的研究
Study on Bond Behavior of Steel Bar in Precast Concrete Composite Slabs
关键词:
预制混凝土叠合板;黏结性能;拉拔试验;锚固长度
Key words:
Precast concrete composite slab; Bond properties; Pull-out experiment; Anchoring length
刊期:
2016年第2期
DOI:
文章编号:
1000-4637(2016)02-63-06
基金项目:
作者:
侯和涛,陈 磊,程佑东,朱文灿
单位:
山东大学土建与水利学院,济南 250061
摘要
摘 要:通过钢筋的拉拔试验研究了预制混凝土叠合板内钢筋的黏结性能。设计30个预制板与后浇混凝土的叠合板试件,主要研究混凝土强度、钢筋锚固长度、钢筋位置、钢筋直径四个因素对黏结性能的影响。并设计12个混凝土现浇试件作为对比,以研究两种试件钢筋与混凝土黏结强度的差异。试验结果表明:叠合试件发生剥离破坏和劈裂-剥离破坏,现浇试件均发生劈裂破坏;叠合试件内钢筋的黏结强度随钢筋直径和锚固长度的减小、混凝土强度和钢筋至预制板距离的增大而增大,并且明显小于现浇试件中钢筋的黏结强度。根据试验结果,统计回归出预制混凝土叠合板钢筋的极限黏结强度计算公式,并由此推出钢筋锚固长度的计算公式以指导工程应用。
Abstract: This paper investigates the bond behavior of steel bars in precast concrete composite slabs through pull-out tests. A total of 30 specimens representing steel rebars embedded in precast concrete composite slabs were prepared for evaluating the influences of concrete strength, anchorage length, embedded location and rebar diameter on bonding strength of the rebars. For comparison purpose, another 12 specimens of the steel rebars embedded in cast-in-place concrete were also tested. Test results show that the rebars embedded in precast concrete composite slabs either exhibit debonding failures or cause splitting failures in the surrounding concrete while the rebars embedded in cast-in-place concrete consistently failed due to splitting failures of the concrete. Additionally, it is found that bonding strength of the rebars embedded in precast concrete composite slabs increases when the rebar diameter and anchorage length reduce. Moreover, bonding strength of the rebars embedded in precast concrete composite slabs tends to be higher when concrete strength is higher and the distance between steel rebars and precast panels becomes larger. Further, test results reveal that bonding strength of the rebars embedded in precast concrete composite slabs is remarkably lower than that of the rebars embedded in cast-in-place concrete. Based upon regression analysis of the test data, an analytical model was proposed for calculating bonding strength of the rebars embedded in precast concrete composite slabs. The model can be used to determine the required anchorage length of the rebars embedded in cast-in-place concrete in design.
结论
参考文献
引用本文
上一个: 蒸压加气混凝土砌块自保温墙体专用砌筑砂浆中钢筋埋置长度的试验研究
下一个: 国产PVA纤维用于高韧性纤维增强水泥基复合材料的试验研究
相关文件