顶进施工法用钢筋混凝土拱涵的研制
Development of Reinforced Concrete Arch Culvert Using Jacking Construction Method
关键词:
组合型圆拱涵;顶进施工法;芯模振动工艺;加固措施;混凝土耐久性
Key words:
Combination type concrete circular arch culvert;Jacking construction method; Core mould vibration technology; Reinforcement meas
刊期:
2016年第3期
DOI:
文章编号:
1000-4637(2016)03-31-05
基金项目:
作者:
朱 丽1,王庆喜1,赵宝阁1,杨海荣2,金作先2,王先进2
单位:
1.辽宁衍水集团水工水泥制品有限公司,辽阳111000; 2.辽宁衍水集团建筑设计研究所,辽阳 111000
摘要
摘 要:探讨了城市综合管廊用的几种顶进施工法钢筋混凝土拱涵的断面形式,分析了方形、圆形等混凝土拱涵的优势,设计了组合型钢筋混凝土圆拱涵。该涵体制作采用芯模振动工艺,局部采取加固措施,具有耐久性优良、劳动生产率高、现场安装方便、顶进力较小等优点。
Abstract: Several kinds of the cross section forms of reinforced concrete arch culvert for urban comprehensive utility tunnel using jacking construction method are discussed. Based on the advantages of square and circular concrete arch culvert, a combination type concrete circular arch culvert is designed. The concrete circular arch culvert are produced by using core mould vibration technology and local reinforcement measures and have the advantages of excellent durability, high productivity, easy installation, and the small jacking force.
结论
参考文献
引用本文
上一个: 新型快速运模地铁管片自动化生产线
下一个: 石墨烯和碳纳米管水泥基复合材料研究进展
相关文件