PHC管桩安全起吊最大长度的计算方法探讨

Calculation Method Discussion on the Maximum Length of PHC Pile Safe Hoisting

浏览量:

关键词:

管桩;弯矩;安全起吊;最大长度

Key words:

Pile; Bending moment; Safe hoisting; Maximum length

刊期:

2016年第4期

DOI:

文章编号:

1000-4637(2016)04-36-05

基金项目:

作者:

何友林

单位:

广东三和管桩有限公司,中山 528414

摘要

摘   要:通过对管桩产品两端起吊和两点起吊时的受力状态进行分析,分别推导出了管桩产品两端起吊和两点起吊时的最大弯矩和长度的关系式。并以管桩开裂弯矩检验值作为安全起吊的最大弯矩控制条件,动力系数取1.5倍,分别计算出了管桩产品两端起吊和两点起吊时安全起吊的最大长度,为管桩安全生产保证管桩产品质量提供了理论依据。

Abstract:By force analysis for hoisting PHC pile at the two ends and at the two fixed points, the relational expressions of the maximum bending moment and the length of pile are put forward separately when the pile is hoisted at the two ends and at the two fixed points. The maximum lengths of pile safe hoisting are calculated separately for hoisting PHC pile at the two ends and at the two fixed points according that the maximum bending moment of safe hoisting pile should be less or equal to the crack bending moment inspection value. Here, the dynamic coefficient is 1.5. The theoretical basis is provided for hoisting piles safely and guaranteeing quality of piles.

结论

(1)对管桩产品两端起吊和两点起吊时的受力状态进行分析,分别推导出了管桩产品两端起吊和两点起吊时的最大弯矩和长度的关系式。
(2)以管桩开裂弯矩检验值作为安全起吊的最大弯矩控制条件,动力系数取1.5倍,分别计算出了管桩产品两端起吊和两点起吊时安全起吊的最大长度,为管桩安全生产保证管桩产品质量提供了理论依据。
(3)采取两点起吊,管桩安全起吊的最大长度将会明显增长;当起吊时管桩长度超出理论值时建议采取真空吸盘吊具或多点起吊等安全措施。

参考文献

[1] 苏州混凝土水泥制品研究院.GB13746—2009先张法预应力混凝土管桩[S].北京:中国标准出版社,2009.
[2] 中国建筑标准设计研究院.10G409预应力混凝土管桩 [S].北京:中国计划出版社,2010.
[3] 何友林.PHC管桩堆放层数的计算方法探讨[J].混凝土与水泥制品,2014(10):38-41.
 

引用本文


上一个: 悬辊法制管易发生的质量通病及解决方法

下一个: 回弹法推定砌体中普通混凝土实心砖抗压强度的研究