Y型巨柱斜撑高位转换结构顶升泵送混凝土施工技术

Construction Technology of Jack-up Pumping Concrete for Y Type Giant Rider Shore High-level Transfer Structure

浏览量:

关键词:

高位转换体系;钢管混凝土;自密实混凝土;泵送顶升;施工技术

Key words:

High conversion system; Concrete filled steel tube; Self-compacting concrete; Pumping jack-up; Construction technology

刊期:

2016年第7期

DOI:

文章编号:

1000-4637(2016)07-72-05

基金项目:

作者:

李树文,余红福,龙叶天,蔡继斌,刘 雨

单位:

中建三局集团有限公司成都分公司,610041)

摘要

摘   要: Y型巨柱斜撑高位转换结构是一种较为复杂的钢管混凝土结构体系,基于此类结构内部带有多层加劲肋板的封闭钢管混凝土结构具有操作空间狭小,浇筑工艺困难、内部空气难以排除、混凝土成型质量不易控制的特点。本文结合西宁某工程实践,提出了一种Y型巨柱斜撑高位转换体系中高位封闭斜撑钢管自密实混凝土的泵送顶升施工技术。

Abstract: Y type giant rider shore high-level transfer structure is a complex concrete-filled steel tube structure system. Based on characteristic that of closed concrete-filled steel tube structure with multilayer stiffening rib plate in inner of this type of structure has limited operation space and it is difficult to pour concrete, exhaust air and control the molding quality of concrete. Combined with a Xining engineering practice, pumping jack-up construction technique of high-level closed rider shore in concrete-filled steel tube and self-compacting concrete in Y type giant rider shore high-level transfer system is put forward.

结论

随着社会经济的发展,造型新颖的建筑日益增多,钢-混凝土组合结构的应用越来越广泛,顶升泵送混凝土施工技术越来越多地应用于实际工程中,而类似的高位转换体系中斜撑钢管混凝土也将会更多地应用于工程设计中。
本工程通过顶升泵送混凝土浇筑工艺的实施,克服了青藏高原高寒地区高性能补偿收缩自密实混凝土配合比设计难点,并解决了混凝土泵送压力的计算以及机械选型、巨型钢管混凝土柱斜撑的顶升施工、泵管布置及加固等一系列技术难题,总结了一套针对此类钢管混凝土浇筑的施工工艺,可为今后类似工程提供借鉴。